Ilford Depot

The Ilford Depot will provide stabling for up to 12 trains from Crossrail rolling stock along the north eastern section of the Crossrail network. The main works include;
• Provision of 10 No new stabling sidings
• Provision of 2 No stabling / bypass roads
• Demolition of workshop B, the existing paint shop, mess building and Shunters Cabin
• A replacement paint shop and new Logistics and Stores building for Bombardier Transportation
• Crossrail accommodation building for CTOC staff including a new depot control room
• Modification to Bombardier Transportation Workshop A to reinstate 2 rail lines
• Create a ‘swimming pool’ type maintenance area to roads 3, 4 and 5, extend roads 6 and 7 at the east end
• Install a new corrosion/welding booth, provide a new roof and side cladding
• Infrastructure upgrades, utilities connections and provision of traction power throughout via 25kV overhead lines.

Client: VolkerFitzpatrick

Approx Value: £50m

May 2012 to July 2016